A construction loan is paid out in stages as your build progresses, so lenders need to see your plans, your contract and your finances before they commit.
If you are planning to build in Ormond, knowing these building finance requirements early lets you line up your builder, your plans and your lender in the right order. It also helps you avoid delays once work starts.
What Are the Building Finance Requirements for a Construction Loan?
Lenders generally want to see that you can afford the repayments, that the build is properly documented and that the finished home will be worth what the loan assumes. Each lender sets its own detail, so the exact list varies.
In practice, a construction loan application usually involves a signed fixed price building contract with a registered builder, council plans and the council approval or permit, and a valuation of the land and the completed home. Your income, expenses, debts and savings are assessed in the usual way. Lenders must test your ability to repay at a rate at least 3 percentage points above the loan rate. Your borrowing capacity is therefore assessed with a buffer, and our borrowing capacity page explains how this works.
The trade-off is paperwork. A construction loan needs more documents than a standard purchase, and gaps in the plans or contract can hold up your application.
How Does a Construction Draw Schedule Work?
A construction draw schedule releases your loan in instalments, each tied to a stage of the build, rather than as one lump sum. The lender usually pays the builder after a progress inspection confirms the stage is complete.
In Victoria, the Domestic Building Contracts Act 1995 limits the deposit to 5 per cent for contracts of $20,000 or more. For a contract to build all stages, the usual schedule is 10 per cent at base, 15 per cent at frame, 35 per cent at lock-up and 25 per cent at fixing. The remainder is typically due at completion. Consumer Affairs Victoria advises getting legal advice before agreeing to a different schedule. It also notes that insurance may not cover work paid for before it is done.
A lender will often match its drawdowns to your contract stages, but the number of drawdowns and inspection rules differ between lenders. Ask about this early. Your builder uses these payments to cover costs such as plumbers, electricians and other sub-contractors, so a slow drawdown can slow the site.
How Is Interest Charged During the Build?
During construction you are generally charged interest only on the amount drawn so far, not on the full approved loan. Repayments therefore start small and rise as more of the loan is released.
NSW Government guidance notes that a borrower financing a project home starts repayments once the first progress payment is made. Lenders may offer interest-only repayment during the build, then move to principal and interest. Some charge a fee for each progress payment, so ask for the fee schedule.
As an illustration only, at 6.75% p.a. a $200,000 drawn balance costs about $1,125 a month in interest-only repayments ($200,000 x 6.75% / 12). Once the full loan is drawn, the monthly amount will be higher. Rates vary by lender and deposit size, and the rate that applies to you may differ.
Ready to get started?
Book a chat with a Finance Broker at Finance Broker Melbourne today.
What Does a Land and Construction Package Change?
A land and construction package combines the land purchase and the build contract, and lenders will assess both together. A separate land purchase followed by a build contract is also possible, but the funding steps differ.
Consider an Ormond couple who buy land first and plan to demolish and rebuild. They settle on the land with a loan, then sign a fixed price contract with a registered builder. The lender values the land and the plans, sets a drawdown schedule that follows the contract and requires the builder's insurance certificate. Because construction draws begin after land settlement, the couple's repayments grow gradually as each stage is paid. Their broker checks the contract stages against the lender's inspection process before signing. This avoids a mismatch that would leave the builder waiting for payment. The build completes, the loan converts to standard principal and interest repayments, and the couple have a clear view of costs at each step.
If you are a first-time builder, our first home buyers page covers grants and concessions that may apply, and the stamp duty page explains how duty can depend on the structure of your purchase.
Why Does the Builder and Contract Type Matter to Lenders?
Lenders prefer a fixed price building contract with a registered builder because the total cost is known. A cost plus contract leaves the final price open, which many lenders view as higher risk.
Owner-builder finance is offered by some lenders on their own terms, which may be stricter. Ask your lender. If your plans change mid-build, variations can push costs above what the lender has approved. Keep a buffer in your budget and talk to your lender before agreeing to any variation.
Victorian domestic building contract rules are due to change from 31 March 2027 under the Domestic Building Contracts Amendment Act 2025. Details of the new deposit and payment settings are to be set by regulation, so check the current rules with your builder and lawyer before you sign.
How Do You Prepare for Council Approval Before You Apply?
Have your plans and council approval in order before you apply, because a lender will not usually release funds without them. The council planning permit and building permit can take time, so start them early.
Your builder or designer normally lodges the plans, and your broker can confirm which documents your chosen lender wants. Some lenders also require that you commence building within a set period after approval. Check this timeframe so a delay on site does not put your loan at risk.
A good way to prepare is to speak with a construction loans broker before you finalise the contract. Our broker can compare options from lenders across Australia and match them to your build timeline.
Can You Use the First Home Owner Grant When Building?
Yes, in Victoria the First Home Owner Grant is $10,000 for a new home valued up to $750,000. Eligibility rules apply, so confirm the details with the State Revenue Office or your broker before you sign.
Grant payments can be linked to your first drawdown, so ask your lender how this works. If you will rent the home out, speak to your accountant about the tax treatment of interest and capital works deductions, as these depend on your circumstances.
To see where your finances sit before you commit, a loan health check is a useful first step. If you live in or near Ormond, our Ormond mortgage broker page has local contact details.
Call one of our team or book an appointment at a time that works for you, and we will map out your construction finance before you sign a building contract.
Frequently Asked Questions
How is interest charged on a construction loan?
Interest is generally charged only on the amount you have drawn down, so repayments rise as the build progresses. Some lenders also charge a fee for each progress payment.
What documents does a lender need for a construction loan?
Lenders usually want a signed building contract with a registered builder, council plans and approval, and a valuation. They also assess your income, debts and savings in the usual way.
What is a construction draw schedule?
It is a plan that releases your loan in stages as each part of the build is completed. Payment usually follows a progress inspection.
Can I get the First Home Owner Grant when building in Victoria?
The grant is $10,000 for a new home valued up to $750,000, subject to eligibility rules. Check the details with the State Revenue Office or your broker before signing a contract.